17th of July, mi, Chujing, Boey and BenJie decided to overnight in school in order to complete our last requirement of Maju Journey Test.
Since we had the whole afternoon nothing to do, Chujing then suggested us to build the bridge, which is one of the requirement in King Scout badges.
The requirement of the bridge is: it must contains at least 2 tripod, and at least 5 meter long.
So, 4 of us started planning the look of the bridge. But anyway, we did not care the physical appearances of the bridge. Instead, we cared about the stability of the bridge. All we had to do was to build up a firm and unshakable bridge.
Firstly, Boey had came out with a plan.
Well, stupid right?
How could this kind of bridge be stable?
Yet, Boey adhered to his "genius" punya planning...
To avoid any pointless wrangle, as Gary (our scouter) said that "scouts must cooperate mah", we just followed his plan, but still dissatisfied.
We built up 3 tripods, but had not finish up the bases. And den, Boey said that he need to go back home to prepare something, and will come back later. So, we stopped our work and took the opportunity to get a rest as Boey went back.
After our dinner, we carried on our bridge building. And also, we decided to change the plan, as we knew the bridge in Boey's plan would NEVER be firm enough for us to step on it.
Chujing went searching types of scouting bridge via the Internet in scout den and finally, he found one interesting one, which was "monkey bridge".
2 comments:
hey noob, you left out something in my plan, I did put the strings as the two handles,K? Well, you are stupid rite? calling people stupid somemore....= =
who r u? =.=ll
Post a Comment